MISTA 2005
MISTA 2005 took place in New York on 18th to 21st July 2005.
Papers presented at MISTA 2005
Show all Bibtex Close all Bibtex
- Nikolakopoulos, A. and H. Sarimveis (2005). A tsp formulation of the dna sequencing problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 8-10
(pdf)
- Show BibTex
- @CONFERENCE{Nikolakopoulos2005,
author = {Nikolakopoulos, A. and Sarimveis, H.},
title = {A TSP Formulation of the DNA Sequencing Problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {8 - 10},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A TSP Formulation of the DNA Sequencing Problem.pdf:A TSP Formulation
of the DNA Sequencing Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.05.28}
}
- Rudova, H. and M. Vlk (2005). Multi-criteria soft constraints in timetabling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 11-15
(pdf)
- Show BibTex
- @CONFERENCE{Rudova2005,
author = {Rudova, H. and Vlk, M.},
title = {Multi-Criteria Soft Constraints in Timetabling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {11 - 15},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Multi Criteria Soft Constraints in Timetabling.pdf:Multi Criteria
Soft Constraints in Timetabling.pdf:PDF},
owner = {dap},
timestamp = {2008.05.28}
}
- Duin, C. and H. van der Sluis (2005a). Models for adjacent resource scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multi-disciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 16-17
(pdf)
- Show BibTex
- @CONFERENCE{Duin2005,
author = {Duin, C.W. and van der Sluis, H.J.},
title = {Models for Adjacent Resource Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {16-17},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Models for Adjacent Resource Scheduling.pdf:Models for Adjacent Resource
Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Karaesmen, I., P. Keskinocak, S. Tayur, and W. Yang (2005). Scheduling multiple types of time-shared aircraft: Models and methods for practice. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 19-38
(pdf)
- Show BibTex
- @CONFERENCE{Karaesmen2005,
author = {Karaesmen, I. and Keskinocak, P. and Tayur, S. and Yang, W.},
title = {Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods
for Practice},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {19-38},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling Multiple Types of Time Shared Aircraft Models and Methods
for Practice.pdf:Scheduling Multiple Types of Time Shared Aircraft
Models and Methods for Practice.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- De Causmaecker, P., P. Demeester, G. Vanden Berghe, and B. Verbeke (2005). Systems design for scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 40-41
(pdf)
- Show BibTex
- @CONFERENCE{DeCausmaecker2005,
author = {De Causmaecker, P. and Demeester, P. and Vanden Berghe, G. and Verbeke,
B.},
title = {Systems Design for Scheduling},
booktitle = {Proceedings of the 1st Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {40-41},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Systems Design for Scheduling.pdf:Systems Design for Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Mason, S., M. Pfund, and J. Fowle (2005). A deterministic scheduling approach for wafer fabrication facilities. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 42-43
(pdf)
- Show BibTex
- @CONFERENCE{Mason2005,
author = {Mason, S.J. and Pfund, M. and Fowle, J.},
title = {A Deterministic Scheduling Approach for Wafer Fabrication Facilities},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {42-43},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Deterministic Scheduling Approach for Wafer Fabrication Facilitiespdf.pdf:A
Deterministic Scheduling Approach for Wafer Fabrication Facilitiespdf.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Fowler, J., E. Kutanoglu, and S. Mason (2005). Multiple orders per job scheduling problems. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 44-45
(pdf)
- Show BibTex
- @CONFERENCE{Fowler2005,
author = {Fowler, J. and Kutanoglu, E. and Mason, S.},
title = {Multiple Orders per job Scheduling Problems},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {44-45},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Multiple Orders Per Job Scheduling Problems.pdf:Multiple Orders Per
Job Scheduling Problems.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Gomes, M., A. Barbosa-Pvoa, and A. Novais (2005). Optimal reactive scheduling for job shop, make-toorder industries: A mould making industry case study. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 46
(pdf)
- Show BibTex
- @CONFERENCE{Gomes2005,
author = {Gomes, M.C. and Barbosa-Pvoa, A. and Novais, A.Q.},
title = {Optimal Reactive Scheduling for Job Shop, Make-Toorder Industries:
A Mould Making Industry Case Study},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {46},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Optimal Reactive Schedulign for Job Shop make to order Industries.pdf:Optimal
Reactive Schedulign for Job Shop make to order Industries.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Erramilli, V. and S. Mason (2005). Multiple orders per job batch scheduling with incompatible jobs. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 48-64
(pdf)
- Show BibTex
- @CONFERENCE{Erramilli2005,
author = {Erramilli, V. and Mason, S.J.},
title = {Multiple Orders per Job Batch Scheduling with Incompatible Jobs},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {48-64},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Multiple Orders per Job Batch Scheduling with Incompatible Jobs.pdf:Multiple
Orders per Job Batch Scheduling with Incompatible Jobs.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Maravelias, C. (2005). A decomposition approach for batch scheduling in the process industry. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 66-67
(pdf)
- Show BibTex
- @CONFERENCE{Maravelias2005,
author = {Maravelias, C.T.},
title = {A Decomposition Approach for Batch Scheduling in the Process Industry},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {66-67},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Decomposition Approach for Batch Scheduling in the Process Industry.pdf:A
Decomposition Approach for Batch Scheduling in the Process Industry.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Glass, C. (2005). How to maximize rewards in an incentived made-to-order scheduling environment. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 69
(pdf)
- Show BibTex
- @CONFERENCE{Glass2005,
author = {Glass, C.A.},
title = {How to Maximize Rewards in an Incentived made-to-order Scheduling
Environment},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {69},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {How to Maximize Rewards in an Incentive made to order Scheduling Environment.pdf:How
to Maximize Rewards in an Incentive made to order Scheduling Environment.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Lei, L., S. Park, and S. Liu (2005). On the capacitated packing-delivering problem with a fixed route. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 70
(pdf)
- Show BibTex
- @CONFERENCE{Lei2005,
author = {Lei, L. and Park, S. and Liu, S.},
title = {On the Capacitated Packing-Delivering Problem with a Fixed Route},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {70},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {On the Capacitated Packing Delivering Problem with a Fixed Route.pdf:On
the Capacitated Packing Delivering Problem with a Fixed Route.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Foong, W., H. Maier, and A. Simpson (2005). Ant colony optimization for power plant maintenance scheduling optimization: A simplied hydro tasmania system. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 72
(pdf)
- Show BibTex
- @CONFERENCE{Foong2005,
author = {Foong, W.K. and Maier, H.R. and Simpson, A.R.},
title = {Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:
A Simplified Hydro Tasmania System},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {72},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization.pdf:Ant
Colony Optimization for Power Plant Maintenance Scheduling Optimization.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Duenas, A. and D. Petrovic (2005). An approach to predictive-reactive scheduling of parallel machines subject to disruptions. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 74-91
(pdf)
- Show BibTex
- @CONFERENCE{Duenas2005,
author = {Duenas, A. and Petrovic, D.},
title = {An Approach to Predictive-Reactive Scheduling of Parallel Machines
Subject to Disruptions},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {74-91},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {An Approach to Predictive Reactive Scheduling of Parallel Machines
Subject to Disruptions.pdf:An Approach to Predictive Reactive Scheduling
of Parallel Machines Subject to Disruptions.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Adenso-Diaz, B., J. Bautista, and J. Pereira (2005). Approximate solutions for a new version of the car sequencing problem (abstract). In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 93-96
(pdf)
- Show BibTex
- @CONFERENCE{Adenso-Diaz2005,
author = {Adenso-Diaz, B. and Bautista, J. and Pereira, J.},
title = {Approximate Solutions for a New Version of the Car Sequencing Problem
(Abstract)},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {93-96},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Approximate Solutions for a New Version of the Car Sequencing Problem.pdf:Approximate
Solutions for a New Version of the Car Sequencing Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Roberts, M., L. Whitley, A. Howe, and L. Barbulescu (2005). Random walks and neighborhood bias in oversubscribed scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 98-105
(pdf)
- Show BibTex
- @CONFERENCE{Roberts2005,
author = {Roberts, M. and Whitley, L.D. and Howe, A.E. and Barbulescu, L.},
title = {Random Walks and Neighborhood Bias in Oversubscribed Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {98-105},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Random Walks and Neighbourhood Bias In Oversubscribed Scheduling.pdf:Random
Walks and Neighbourhood Bias In Oversubscribed Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Brucker, P. and T. Kampmeyer (2005). Tabu search algorithms for cyclic machine scheduling problems with blocking. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 107-108
(pdf)
- Show BibTex
- @CONFERENCE{Brucker2005,
author = {Brucker, P. and Kampmeyer, T.},
title = {Tabu Search Algorithms For Cyclic Machine Scheduling Problems with
Blocking},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {107-108},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Tabu Search Algorithms for Cyclic Machine Scheduling Problems with
Blocking.pdf:Tabu Search Algorithms for Cyclic Machine Scheduling
Problems with Blocking.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Laplagne, I., R. Kwan, and A. Kwan (2005). Repair cost-guided local search for scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 109-110
(pdf)
- Show BibTex
- @CONFERENCE{Laplagne2005,
author = {Laplagne, I. and Kwan, R.S.K. and Kwan, A.S.K.},
title = {Repair Cost-Guided Local Search for Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {109-110},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Repair Cost Guided Local Search for Scheduling.pdf:Repair Cost Guided
Local Search for Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Balasubramanian, H., J. Fowler, and A. Keha (2005). Bicriteria scheduling of equal length jobs with release dates on identical parallel machines. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 112-122
(pdf)
- Show BibTex
- @CONFERENCE{Balasubramanian2005,
author = {Balasubramanian, H. and Fowler, J. and Keha, A.},
title = {Bicriteria Scheduling of Equal Length Jobs with Release Dates on
Identical Parallel Machines},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {112-122},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Bicriteria Scheduling for Equal Length Jobs with Release Dates on
Identical Parallel Machinespdf.pdf:Bicriteria Scheduling for Equal
Length Jobs with Release Dates on Identical Parallel Machinespdf.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Bouibede-Hocine, K. and V. T'kindt (2005). Enumeration of pareto optima for uniform parallel machine scheduling with two criteria. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 123-131
(pdf)
- Show BibTex
- @CONFERENCE{Bouibede-Hocine2005,
author = {Bouibede-Hocine, K. and T'kindt, V.},
title = {Enumeration of Pareto Optima for Uniform Parallel Machine Scheduling
with Two Criteria},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {123-131},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Enumeration of Pareto Optima for Uniform Parallel Machine Scheduling
with Two Criteria.pdf:Enumeration of Pareto Optima for Uniform Parallel
Machine Scheduling with Two Criteria.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Gordon, V. and A. Tarasevich (2005). Heuristic approaches to a common due date earliness-tardiness scheduling problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 132-139
(pdf)
- Show BibTex
- @CONFERENCE{Gordon2005,
author = {Gordon, V.S. and Tarasevich, A.A.},
title = {Heuristic Approaches to a Common Due Date Earliness-Tardiness Scheduling
Problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {132-139},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Heuristic Approaches to a Common Due Date Earliness Tardiness Scheduling
Problem.pdf:Heuristic Approaches to a Common Due Date Earliness Tardiness
Scheduling Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Hendel, Y. and F. Sourd (2005). The single machine just-in-time scheduling problem with preemptions. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 140-148
(pdf)
- Show BibTex
- @CONFERENCE{Hendel2005,
author = {Hendel, Y. and Sourd, F.},
title = {The Single Machine Just-In-Time Scheduling Problem with Preemptions},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {140-148},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {The Single Machine Just in Time Scheduling Problem with Preemptions.pdf:The
Single Machine Just in Time Scheduling Problem with Preemptions.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Steiner, G. and D. Shabtay (2005). The single-machine earliness-tardiness scheduling problem with due date assignment and resouce-dependent processing times. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multi-disciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 149-161
(pdf)
- Show BibTex
- @CONFERENCE{Steiner2005,
author = {Steiner, G. and Shabtay, D.},
title = {The Single-Machine Earliness-Tardiness Scheduling Problem with Due
Date Assignment and Resouce-Dependent Processing Times},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {149-161},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {The Single Machine Earliness Tardiness Scheduling Problem with Due
Date Assignment.pdf:The Single Machine Earliness Tardiness Scheduling
Problem with Due Date Assignment.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Oguz, C. and E. Ycel (2005). A branch-and-bound algorithm for single machine total tardiness problem with release dates. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 162-168
(pdf)
- Show BibTex
- @CONFERENCE{Oguz2005,
author = {Oguz, C. and Ycel, E.},
title = {A Branch-and-Bound Algorithm for Single Machine Total Tardiness Problem
with Release Dates},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {162-168},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Branch and Bound Algorithm for Single Machine Total Tardiness Problem
with Release Dates.pdf:A Branch and Bound Algorithm for Single Machine
Total Tardiness Problem with Release Dates.pdf:PDF},
owner = {dap},
timestamp = {2008.08.29}
}
- Rios Solis, Y. and F. Sourd (2005). Large neighborhood for a parallel scheduling problem with earliness-tardiness penalties and a common due date. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 169-184
(pdf)
- Show BibTex
- @CONFERENCE{RiosSolis2005,
author = {Rios Solis, Y.A. and Sourd, F.},
title = {Large Neighborhood for a Parallel Scheduling Problem with Earliness-Tardiness
Penalties and a Common Due Date},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {169-184},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Large Neighbourhood for a Parallel Scheduling Problem with Earliness
Tardiness Penalties and a Common Due Date.pdf:Large Neighbourhood
for a Parallel Scheduling Problem with Earliness Tardiness Penalties
and a Common Due Date.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Keha, A. and J. Fowler (2005). A divide-and-merge heuristic for single machine weighted tardianess problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 186-187
(pdf)
- Show BibTex
- @CONFERENCE{Keha2005,
author = {Keha, A. and Fowler, J.},
title = {A Divide-and-Merge Heuristic for Single Machine Weighted Tardianess
Problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {186-187},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Divide and Merge Heuristic for Single Machine Weighted Tardiness
Problem.pdf:A Divide and Merge Heuristic for Single Machine Weighted
Tardiness Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Bulbul, K. (2005). Job shop scheduling with earliness, tardiness and intermediate inventory holding costs. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 188-192
(pdf)
- Show BibTex
- @CONFERENCE{Bulbul2005,
author = {Bulbul, K.},
title = {Job Shop Scheduling with Earliness, Tardiness and Intermediate Inventory
Holding Costs},
booktitle = {Proceedings of the 1st Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {188-192},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Job Shop Scheduling with Earliness Tardiness and Intermediate Inventory
Holding Costs.pdf:Job Shop Scheduling with Earliness Tardiness and
Intermediate Inventory Holding Costs.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Baptiste, P. and C. Le Pape (2005). Scheduling a single machine to minimize a regular objective function under setup constraints. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 193-195
(pdf)
- Show BibTex
- @CONFERENCE{Baptiste2005,
author = {Baptiste, P. and Le Pape, C.},
title = {Scheduling a Single Machine to Minimize a Regular Objective Function
under Setup Constraints},
booktitle = {Proceedings of the 1st Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {193-195},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling a Single Machine to Minimize a Regular Objective Function
Under Setup Constraints.pdf:Scheduling a Single Machine to Minimize
a Regular Objective Function Under Setup Constraints.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Feng, G. and H. Lau (2005). Ecient algorithms for machine scheduling problems with earliness and tardiness penalties. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 196-212
(pdf)
- Show BibTex
- @CONFERENCE{Feng2005,
author = {Feng, G and Lau, H.C.},
title = {Efficient Algorithms for Machine Scheduling Problems with Earliness
and Tardiness Penalties},
booktitle = {Proceedings of the 1st Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {196-212},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Efficient Algorithms for Machine Scheduling Problems with Earliness
and Tardiness Penalties.pdf:Efficient Algorithms for Machine Scheduling
Problems with Earliness and Tardiness Penalties.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Leus, R. and W. Herroelen (2005). Stable single-machine schedules. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 213-214
(pdf)
- Show BibTex
- @CONFERENCE{Leus2005,
author = {Leus, R. and Herroelen, W.},
title = {Stable Single-Machine Schedules},
booktitle = {Proceedings of the 1st Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {213-214},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Stable Single Machine Schedules.pdf:Stable Single Machine Schedules.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Savourey, D., A. Jouglet, and B. Baptiste (2005). Lower bounds for parallel machine scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 215-216
(pdf)
- Show BibTex
- @CONFERENCE{Savourey2005,
author = {Savourey, D. and Jouglet, A. and Baptiste, B.},
title = {Lower Bounds for Parallel Machine Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {215-216},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Lower Bounds for Parallel Machine Scheduling.pdf:Lower Bounds for
Parallel Machine Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Zribi, N., A. Kamel, and P. Borne (2005). Job shop scheduling problem with multi-purpose machines and availability constraints. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, pp. 217-231
(pdf)
- Show BibTex
- @CONFERENCE{Zribi2005,
author = {Zribi, N. and Kamel, A.E. and Borne, P.},
title = {Job Shop Scheduling Problem with Multi-purpose Machines and availability
constraints},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {217-231},
file = {Job Shop Scheduling Problem with Multi Purpose Machine and Availability
Constraints.pdf:Job Shop Scheduling Problem with Multi Purpose Machine
and Availability Constraints.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Guirchoun, S., A. Souhkal, and P. Martineau (2005). Complexity results for parallel machine scheduling problems with a server in computer systems. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 232-236
(pdf)
- Show BibTex
- @CONFERENCE{Guirchoun2005,
author = {Guirchoun, S. and Souhkal, A. and Martineau, P.},
title = {Complexity Results for Parallel Machine Scheduling Problems with
a Server in Computer Systems},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {232-236},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Complexity Results for Parallel Machine Scheduling Problems with a
Server in Computer Systems.pdf:Complexity Results for Parallel Machine
Scheduling Problems with a Server in Computer Systems.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Ouelhadj, D., J. Garibaldi, and R. Sakellariou (2005). A service level agreement protocol and tabu search for scheduling on computational grids. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 238-243
(pdf)
- Show BibTex
- @CONFERENCE{Ouelhadj2005,
author = {Ouelhadj, D. and Garibaldi, J.M. and Sakellariou, R.},
title = {A Service Level Agreement Protocol and Tabu Search for Scheduling
on Computational Grids},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {238-243},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Service Level Agreeement Protocol and Tabu Search for Scheduling
on Computational Grids.pdf:A Service Level Agreeement Protocol and
Tabu Search for Scheduling on Computational Grids.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Angel, E., E. Bampis, and F. Pascual (2005). How good are SPT Schedules for Fair Optimality Criteria. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 244-257
(pdf)
- Show BibTex
- @CONFERENCE{Angel2005,
author = {Angel, E. and Bampis, E. and Pascual, F.},
title = {How Good are SPT Schedules for Fair Optimality Criteria},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {244-257},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {How Good are SPT Schedules for Fair Optimality Criteria.pdf:How Good
are SPT Schedules for Fair Optimality Criteria.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Bose, S. and S. Bhattacharya (2005). A heuristic algorithm for scheduling 'blocked out' units in continuous processing industry: Preliminary results. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 258-274
(pdf)
- Show BibTex
- @CONFERENCE{Bose2005,
author = {Bose, S.K. and Bhattacharya, S.},
title = {A Heuristic Algorithm for Scheduling 'Blocked Out' Units in Continuous
Processing Industry: Preliminary Results},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {258-274},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Heuristic Algorithm for Scheduling Blocked Out Units in Continuous
Processing Industry.pdf:A Heuristic Algorithm for Scheduling Blocked
Out Units in Continuous Processing Industry.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Pfund, M., H. Balasubramanian, J. Fowler, and S. Mason (2005). A bi-criteria approach to scheduling wafer fabrication facilities. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 276-284
(pdf)
- Show BibTex
- @CONFERENCE{Pfund2005,
author = {Pfund, M. and Balasubramanian, H. and Fowler, J. and Mason, S.},
title = {A Bi-Criteria Approach to Scheduling Wafer Fabrication Facilities},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {276-284},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A BiCriteria Approach to Scheduling Wafer Fabrication Facilities.pdf:A
BiCriteria Approach to Scheduling Wafer Fabrication Facilities.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Laub, J., J. Fowler, and A. Keha (2005). Minimizing makespan with multiple orders per job in a two machine flowshop with item processing. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 288-298
(pdf)
- Show BibTex
- @CONFERENCE{Laub2005,
author = {Laub, J.D. and Fowler, J.W. and Keha, A.B.},
title = {Minimizing Makespan with Multiple Orders per Job in a Two Machine
Flowshop with Item Processing},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {288-298},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Minimizing Makespan with Multiple Orders per Job in a Two Machine
Flowshop with Item Processing.pdf:Minimizing Makespan with Multiple
Orders per Job in a Two Machine Flowshop with Item Processing.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Lin, S.-W. and S.-Y. Chou (2005). A sequential pair exchange approach for solving single-machine scheduling problems with general earliness-tardiness penalties. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 299-314
(pdf)
- Show BibTex
- @CONFERENCE{Lin2005,
author = {Lin, S-W. and Chou, S-Y},
title = {A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling
Problems with General Earliness-Tardiness Penalties},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {299-314},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Sequential Pair Exchainge Approach for Solving Single Machine Scheduling
Problems with General Earliness Tardiness Penalties.pdf:A Sequential
Pair Exchainge Approach for Solving Single Machine Scheduling Problems
with General Earliness Tardiness Penalties.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Artigues, C., F. Buscaylet, and D. Feillet (2005). Lower and upper bounds for the job-shop scheduling problem with sequence-dependent setup times. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 316-321
(pdf)
- Show BibTex
- @CONFERENCE{Artigues2005,
author = {Artigues, C. and Buscaylet, F. and Feillet, D.},
title = {Lower and Upper Bounds for the Job-Shop Scheduling Problem with Sequence-Dependent
Setup Times},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {316-321},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Lower and Upper Bounds for the Job Shop Scheduling Problem with Sequence
Dependent Setup Times.pdf:Lower and Upper Bounds for the Job Shop
Scheduling Problem with Sequence Dependent Setup Times.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Braeckmans, K., E. Demeulemeester, and W. Herroelen (2005). Proactive resource allocation heuristics for robust project scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 322-323
(pdf)
- Show BibTex
- @CONFERENCE{Braeckmans2005,
author = {Braeckmans, K. and Demeulemeester, E. and Herroelen, W.},
title = {Proactive Resource Allocation Heuristics for Robust Project Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {322-323},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Proactive Resource Allocation Heuristics for Robust Project Scheduling.pdf:Proactive
Resource Allocation Heuristics for Robust Project Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Doganis, P., H. Sarimveis, A. Alexandridis, and P. Patrinos (2005). Optimal production scheduling for dairy industries. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 324-325
(pdf)
- Show BibTex
- @CONFERENCE{Doganis2005,
author = {Doganis, P. and Sarimveis, Haralambos. and Alexandridis, A. and Patrinos,
P.},
title = {Optimal Production Scheduling for Dairy Industries},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {324-325},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Optimal Production Scheduling for Dairy Industries.pdf:Optimal Production
Scheduling for Dairy Industries.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Geismar, H., M. Dawande, and C. Sriskandarajah (2005). Approximations to optimal k-unit cycles for dual gripper robot cells. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 326
(pdf)
- Show BibTex
- @CONFERENCE{Geismar2005,
author = {Geismar, H.N. and Dawande, M. and Sriskandarajah, C.},
title = {Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {326},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Approximations to Optimal K Unit Cycles for Dual Gripper Robot Cells.pdf:Approximations
to Optimal K Unit Cycles for Dual Gripper Robot Cells.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Kelly, J. (2005). The unit-operation-stock superstructure (uoss) and the quantity- logic-quality paradigm (qlqp) for production scheduling in the process industries. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multi-disciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 327-333
(pdf)
- Show BibTex
- @CONFERENCE{Kelly2005,
author = {Kelly, J.D.},
title = {The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic-Quality
Paradigm (QLQP) for Production Scheduling in the Process Industries},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {327-333},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {The Unit Operation Stock Superstructure and the Quantity Logic Quality
Paradigm.pdf:The Unit Operation Stock Superstructure and the Quantity
Logic Quality Paradigm.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Tanrusever, F. and E. Kutanoglu (2005). Forming and scheduling jobs with order weights in semiconductor manufacturing. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 334
(pdf)
- Show BibTex
- @CONFERENCE{Tanrusever2005,
author = {Tanrusever, F. and Kutanoglu, E.},
title = {Forming and Scheduling Jobs with Order Weights in Semiconductor Manufacturing},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {334},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Forming and Scheduling Jobs with Order Weights in Semiconductor Manufacturing
.pdf:Forming and Scheduling Jobs with Order Weights in Semiconductor
Manufacturing .pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Lambrechts, O., E. Demeulemeester, and W. Herroelen (2005). A tabu-search based reactive procedure for the rcpsp with stochastic resource availabilities. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 335-336
(pdf)
- Show BibTex
- @CONFERENCE{Lambrechts2005,
author = {Lambrechts, O. and Demeulemeester, E. and Herroelen, W.},
title = {A Tabu-Search Based Reactive Procedure for the RCPSP with Stochastic
Resource Availabilities},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {335-336},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Tabu Search Based Teactive Procedure for the RCPSP with Stochastic
Resource Availabilities.pdf:A Tabu Search Based Teactive Procedure
for the RCPSP with Stochastic Resource Availabilities.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Kimbrel, T. (2005). A survey on minimizing makespan for the preemptive job shop with two machines. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 337-339
(pdf)
- Show BibTex
- @CONFERENCE{Kimbrel2005,
author = {Kimbrel, T.},
title = {A Survey on Minimizing Makespan for the Preemptive Job Shop with
Two Machines},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {337-339},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Survey on Minimizing Makespan for the Preemptive Job Shop with Two
Machines.pdf:A Survey on Minimizing Makespan for the Preemptive Job
Shop with Two Machines.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Sung, C., I. Lee, S. Yoon, and J. Juhn (2005). Single machine product scheduling with outsourcing allowed. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 340
(pdf)
- Show BibTex
- @CONFERENCE{Sung2005,
author = {Sung, C.S. and Lee, I.S. and Yoon, S.H. and Juhn, J.H.},
title = {Single Machine Product Scheduling with Outsourcing Alloweed},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {340},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Single Machine Product Scheduling with Outsourcing Allowed.pdf:Single
Machine Product Scheduling with Outsourcing Allowed.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Van de Vonder, S., E. Demeulemeester, and W. Herroelen (2005). An evaluation of exact and suboptimal procedures for constructing stable project schedules. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multi-disciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 341-342
(pdf)
- Show BibTex
- @CONFERENCE{VandeVonder2005,
author = {Van de Vonder, S. and Demeulemeester, E. and Herroelen, W.},
title = {An Evaluation of Exact and Suboptimal Procedures for Constructing
Stable Project Schedules},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {341-342},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {An Evaluation of Exact and Suboptimal Procedures for Constructing
Stable Project Schedules.pdf:An Evaluation of Exact and Suboptimal
Procedures for Constructing Stable Project Schedules.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Cucu, L. and Y. Sorel (2005). Periodic real-time scheduling: From latency-based model to deadline-based model. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 344-352
(pdf)
- Show BibTex
- @CONFERENCE{Cucu2005,
author = {Cucu, L. and Sorel, Y.},
title = {Periodic Real-Time Scheduling: From Latency-Based Model to Deadline-Based
Model},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {344-352},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Periodic Real Time Scheduling from Latency Based Model to Deadline
Based Model.pdf:Periodic Real Time Scheduling from Latency Based
Model to Deadline Based Model.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Montana, D. (2005). A comparison of combinatorial optimization and dispatch rules for online scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 1, New York, USA (18-21 July 2005), pp. 353-361
(pdf)
- Show BibTex
- @CONFERENCE{Montana2005,
author = {Montana, D.},
title = {A Comparison of Combinatorial Optimization and Dispatch Rules for
Online Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {1},
pages = {353-361},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Comparison of Combinatorial Optimization and Dispatch Rules for
Online Scheduling.pdf:A Comparison of Combinatorial Optimization
and Dispatch Rules for Online Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Petrovic, S., C. Fayad, and D. Petrovic (2005). Job shop scheduling with lot-sizing and batching in an uncertain real-world environment. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 363-379
(pdf)
- Show BibTex
- @CONFERENCE{Petrovic2005,
author = {Petrovic, S. and Fayad, C. and Petrovic, D.},
title = {Job Shop Scheduling with Lot-Sizing and Batching in an Uncertain
Real-World Environment},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {363-379},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Job Shop Scheduline with Lot Sizing and Batching in an Uncertain Real
World Encironment.pdf:Job Shop Scheduline with Lot Sizing and Batching
in an Uncertain Real World Encironment.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Herrmann, J. (2005). A history of decision-making tools for production scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 390-389
(pdf)
- Show BibTex
- @CONFERENCE{Herrmann2005,
author = {Herrmann, J.W.},
title = {A History of Decision-Making Tools for Production Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {390-389},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A History of Decision Making Tools for Production Scheduling.pdf:A
History of Decision Making Tools for Production Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Fordyce, K., R. Burda, A. Degbotse, J. Milne, J. Morrison, and E. Williamson (2005). Challenges in matching assets with demand across all supply chain management decision tiers in the ibm microelectronics division from automated fabs to central planning engines to collaborative behavior (work arounds). In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary
International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 391
(pdf)
- Show BibTex
- @CONFERENCE{Fordyce2005,
author = {Fordyce, K. and Burda, R. and Degbotse, A. and Milne, J. and Morrison,
J.R. and Williamson, E.},
title = {Challenges in Matching Assets with Demand across All Supply Chain
Management Decision Tiers in the IBM Microelectronics Division from
Automated Fabs to Central Planning Engines to Collaborative Behavior
(Work Arounds)},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {391},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Challenges in Matching Assets with Demand Across All Supply Chain
Management.pdf:Challenges in Matching Assets with Demand Across All
Supply Chain Management.pdf:PDF},
owner = {dap},
timestamp = {2008.10.02}
}
- Fowler, J. and M. Pfund (2005). Scheduling wafer fabrication operations: State- of-the-practice and future needs. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 392-393
(pdf)
- Show BibTex
- @CONFERENCE{FowlerPfund2005,
author = {Fowler, J. and Pfund, M.},
title = {Scheduling Wafer Fabrication Operations: State-of-the-Practice and
Future Needs},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {392-393},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling Wafer Fabrication Operations State of the Practive and
Future Needs.pdf:Scheduling Wafer Fabrication Operations State of
the Practive and Future Needs.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Monkman, S., D. Morrice, and J. Bard (2005). Scheduling product families in a high volume, flexible, assemble-to-order factory. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 394-395
(pdf)
- Show BibTex
- @CONFERENCE{Monkman2005,
author = {Monkman, S.K. and Morrice, D.J. and Bard, J.F.},
title = {Scheduling Product Families in a High Volume, Flexible, Assemble-to-Order
Factory},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {394-395},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling Product Families in a High Volume Flexiable Assemble to
Order Factorypdf.pdf:Scheduling Product Families in a High Volume
Flexiable Assemble to Order Factorypdf.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Brucker, P., R. Qu, E. Burke, and G. Post (2005). A decomposition, construction and post-processing approach for nurse rostering. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 397-406
(pdf)
- Show BibTex
- @CONFERENCE{BruckerQu2005,
author = {Brucker, P. and Qu, R. and Burke, E. and Post, G.},
title = {A Decomposition, Construction and Post-Processing Approach for Nurse
Rostering},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {397-406},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Decomposition Construction and Post Processing Approach for Nurse
Rostering.pdf:A Decomposition Construction and Post Processing Approach
for Nurse Rostering.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Belien, J. and E. Demeulemeester (2005). Integrating nurse and surgery scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 408-409
(pdf)
- Show BibTex
- @CONFERENCE{Belien2005,
author = {Belien, J. and Demeulemeester, E.},
title = {Integrating Nurse and Surgery Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {408-409},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Integrating Nurse and Surgery Scheduling.pdf:Integrating Nurse and
Surgery Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Maenhout, B. and M. Vanhoucke (2005). An electromagnetic meta-heuristic for the nurse scheduling problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 410-411
(pdf)
- Show BibTex
- @CONFERENCE{Maenhout2005,
author = {Maenhout, B. and Vanhoucke, M.},
title = {An Electromagnetic Meta-Heuristic for the Nurse Scheduling Problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {410-411},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {An Electromagnetic Meta Heuristic for the Nurse Schedulign Problems.pdf:An
Electromagnetic Meta Heuristic for the Nurse Schedulign Problems.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Abdullah, S., E. Burke, and B. McColum (2005). An investigation of variable neighbourhood search for university course timetabling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 413-427
(pdf)
- Show BibTex
- @CONFERENCE{Abdullah2005,
author = {Abdullah, S. and Burke, E.K. and McColum, B.},
title = {An Investigation of Variable Neighbourhood Search for University
Course Timetabling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {413-427},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {An Investigation of Variable Neighourhood Search for University Course
Timetabling.pdf:An Investigation of Variable Neighourhood Search
for University Course Timetabling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Armstrong, R., L. Lei, and S. Gao (2005). A zero-inventory production-distribution problem with time-window constraints. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 428-445
(pdf)
- Show BibTex
- @CONFERENCE{Armstrong2005,
author = {Armstrong, R. and Lei, L. and Gao, S.},
title = {A Zero-Inventory Production-Distribution Problem with Time-Window
Constraints},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {428-445},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Zero Inventory Production Distribution Problem with Time Window
Constraints.pdf:A Zero Inventory Production Distribution Problem
with Time Window Constraints.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Hanen, C. and Y. Zinder (2005a). Scheduling uet - uct task systems under the out-forest precedence constraints. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 445-452
(pdf)
- Show BibTex
- @CONFERENCE{Hanen2005,
author = {Hanen, C. and Zinder, Y.},
title = {Scheduling UET - UCT Task Systems Under the Out-Forest Precedence
Constraints},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {445-452},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling UET UCT Task Systems Under the Out Forest Precedence Constraints.pdf:Scheduling
UET UCT Task Systems Under the Out Forest Precedence Constraints.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Hanen, C. and Y. Zinder (2005b). The worst-case analysis of the garey-johnson algorithm for preemptive tasks on m processors. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 453-470
(pdf)
- Show BibTex
- @CONFERENCE{HanenZinder2005,
author = {Hanen, C. and Zinder, Y.},
title = {The Worst-case Analysis of the Garey-Johnson Algorithm for Preemptive
Tasks on m Processors},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {453-470},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {The Worst Case Analysis of the Garey Johnson Algorithnm for Preemptive
Tasks.pdf:The Worst Case Analysis of the Garey Johnson Algorithnm
for Preemptive Tasks.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Leung, J.-T., H. Li, and M. Pinedo (2005). Scheduling orders in dedicated and flexible machine environments. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 471-484
(pdf)
- Show BibTex
- @CONFERENCE{Leung2005,
author = {Leung, J.Y-T. and Li, H. and Pinedo, M.},
title = {Scheduling Orders in Dedicated and Flexible Machine Environments},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {471-484},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling Orders in Dedicated and Flexible Machine Environments.pdf:Scheduling
Orders in Dedicated and Flexible Machine Environments.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Tsang, E., T. Gosling, B. Virginas, C. Voudouris, and G. Owusu (2005). Retractable contract network for distributed scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 485-500
(pdf)
- Show BibTex
- @CONFERENCE{Tsang2005,
author = {Tsang, E.P.K. and Gosling, T. and Virginas, B. and Voudouris, C.
and Owusu, G.},
title = {Retractable Contract Network for Distributed Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {485-500},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Retractable Contract Network for Distributed Scheduling.pdf:Retractable
Contract Network for Distributed Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Leung, J.-T. and H. Zhao (2005). Scheduling algorithms for master-slave systems.
In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 501-513
(pdf)
- Show BibTex
- @CONFERENCE{LeungZhao2005,
author = {Leung, J.Y-T and Zhao, H.},
title = {Scheduling Algorithms for Master-Slave Systems},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {501-513},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling Algorithms for Master Slave Systems.pdf:Scheduling Algorithms
for Master Slave Systems.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Aykin, T. and J. McKenna (2005). Skills-based agent scheduling at call centers. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 515
(pdf)
- Show BibTex
- @CONFERENCE{Aykin2005,
author = {Aykin, T. and McKenna, J.S.},
title = {Skills-Based Agent Scheduling at Call Centers},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {515},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Skills Based Agent Scheduling at Call Centers.pdf:Skills Based Agent
Scheduling at Call Centers.pdf:PDF},
owner = {dap},
timestamp = {2008.10.02}
}
- Leung, J. and R. Wong (2005). Timetable synchronization for mass transit. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 516-517
(pdf)
- Show BibTex
- @CONFERENCE{LeungWong2005,
author = {Leung, J.M.Y. and Wong, R.C.W.},
title = {Timetable Synchronization for Mass Transit},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {516-517},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Timetable Synchronization for Mass Transit.pdf:Timetable Synchronization
for Mass Transit.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Bansal, N., L. Fleischer, B. Kimbrel, T. andSchieber, M. Sviridenko, and M. Mahdian (2005). Algorithms for online buer management. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 518
(pdf)
- Show BibTex
- @CONFERENCE{Bansal2005,
author = {Bansal, N. and Fleischer, L.K. and Kimbrel, T. andSchieber, B. and
Sviridenko, M. and Mahdian, M.},
title = {Algorithms for Online Buffer Management},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {518},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Algorithms for Online Buffer Management.pdf:Algorithms for Online
Buffer Management.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Miller, T. (2005). A practitioners approach to distribution and supply chain planning and management. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 519
(pdf)
- Show BibTex
- @CONFERENCE{Miller2005,
author = {Miller, T.},
title = {A Practitioners Approach To Distribution And Supply Chain Planning
And Management},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {519},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Practitioners Approach to Distribution and Supply Chain Planning
and Management.pdf:A Practitioners Approach to Distribution and Supply
Chain Planning and Management.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Balas, E., N. Simonetti, and A. Vazacopoulos (2005). Job shop scheduling with setup times, deadlines and precedence constraints. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 520-532
(pdf)
- Show BibTex
- @CONFERENCE{Balas2005,
author = {Balas, E. and Simonetti, N. and Vazacopoulos, A.},
title = {Job Shop Scheduling with Setup Times, Deadlines and Precedence Constraints},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {520-532},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Job Shop Scheduling with Setup Times Deadlines and Precedence Constraints.pdf:Job
Shop Scheduling with Setup Times Deadlines and Precedence Constraints.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Wang, Z. and W. Zing (2005). Worst-case analysis for queueing service policies. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 533-535
(pdf)
- Show BibTex
- @CONFERENCE{Wang2005,
author = {Wang, Z. and Zing, W.},
title = {Worst-case Analysis for Queueing Service Policies},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {533-535},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Worst Case Analysis for Queueing Service Policies.pdf:Worst Case Analysis
for Queueing Service Policies.pdf:PDF},
owner = {dap},
timestamp = {2008.09.30}
}
- Lau, H., Y. Zhao, and C. Pan (2005). Integrated scheduling of dierent types of handling equipment at automated container terminals. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 536-537
(pdf)
- Show BibTex
- @CONFERENCE{Lau2005,
author = {Lau, H.Y.K. and Zhao, Y. and Pan, C.},
title = {Integrated Scheduling of Different Types of Handling Equipment at
Automated Container Terminals},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {536-537},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Integrated Scheduling of Different Types of Handling Equipment at
Automated Container Terminals.pdf:Integrated Scheduling of Different
Types of Handling Equipment at Automated Container Terminals.pdf:PDF},
owner = {dap},
timestamp = {2008.09.30}
}
- Jampani, J., S. Mason, and V. Erramilli (2005). Single machine multiple orders per job scheduling using column generation. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 539-547
(pdf)
- Show BibTex
- @CONFERENCE{Jampani2005,
author = {Jampani, J. and Mason, S.J. and Erramilli, V.},
title = {Single Machine Multiple Orders per Job Scheduling Using Column Generation},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {539-547},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Single Machine Multiple Orders Per Job Scheduling Using Column Generation.pdf:Single
Machine Multiple Orders Per Job Scheduling Using Column Generation.pdf:PDF},
owner = {dap},
timestamp = {2008.09.30}
}
- Pundoor, G. and Z.-L. Chen (2005). Integrated production-distribution scheduling to optimize the tradeoff between order delivery performance and total cost. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 549-550
(pdf)
- Show BibTex
- @CONFERENCE{Pundoor2005,
author = {Pundoor, G. and Chen, Z-L.},
title = {Integrated Production-Distribution Scheduling to Optimize the Tradeoff
between Order Delivery Performance and Total Cost},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {549-550},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Integrated Production Distribution Scheduling to Optimize the Tradeoff
Between Order Delivery.pdf:Integrated Production Distribution Scheduling
to Optimize the Tradeoff Between Order Delivery.pdf:PDF},
owner = {dap},
timestamp = {2008.09.30}
}
- Fong, P. and R. Piplani (2005). Combined production and distribution scheduling of ready-mix concrete. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 551
(pdf)
- Show BibTex
- @CONFERENCE{Fong2005,
author = {Fong, P.Y. and Piplani, R.},
title = {Combined Production and Distribution Scheduling of Ready-Mix Concrete},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {551},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Combined Production and Distribution Scheduling of Ready Mix Concrete.pdf:Combined
Production and Distribution Scheduling of Ready Mix Concrete.pdf:PDF},
owner = {dap},
timestamp = {2008.09.30}
}
- Bartak, R. and O. Cepek (2005). Incremental propagation rules for a precedence
graph with optional activities and time windows. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 552-560
(pdf)
- Show BibTex
- @CONFERENCE{Bartak2005,
author = {Bartak, R. and Cepek, O},
title = {Incremental Propagation Rules for a Precedence Graph with Optional
Activities and Time Windows},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {552-560},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Incremental Propagation Rules for a Precedence Graph with Optional
Activities and Time Windows.pdf:Incremental Propagation Rules for
a Precedence Graph with Optional Activities and Time Windows.pdf:PDF},
owner = {dap},
timestamp = {2008.10.02}
}
- Bunde, D. (2005). Scheduling on a single machine to minimize total flow time with job rejections. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 562-572
(pdf)
- Show BibTex
- @CONFERENCE{Bunde2005,
author = {Bunde, D.P.},
title = {Scheduling on a Single Machine to Minimize Total Flow Time with Job
Rejections},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {562-572},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling on a Single Machine to Minimize Total Flow Time with Job
Rejections.pdf:Scheduling on a Single Machine to Minimize Total Flow
Time with Job Rejections.pdf:PDF},
owner = {dap},
timestamp = {2008.09.30}
}
- Huo, Y. and J.-T. Leung (2005). Online scheduling of precedence constrained tasks. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 573-586
(pdf)
- Show BibTex
- @CONFERENCE{Huo2005,
author = {Huo, Y. and Leung, J.Y-T.},
title = {Online Scheduling of Precedence Constrained Tasks},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {573-586},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Online Scheduling of Precedence Constrained Tasks.pdf:Online Scheduling
of Precedence Constrained Tasks.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Baille, F., E. Bampis, C. Laforest, and C. Rapine (2005). Bicriteria parallel task
scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 585-596
(pdf)
- Show BibTex
- @CONFERENCE{Baille2005,
author = {Baille, F. and Bampis, E. and Laforest, C. and Rapine, C.},
title = {Bicriteria Parallel Task Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {585-596},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Bicriteria Parallel Task Scheduling.pdf:Bicriteria Parallel Task Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Adelson-Velsky, G., A. Gelbukh, and E. Levner (2005). On project scheduling with and/or precedence constraints. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 597-605
(pdf)
- Show BibTex
- @CONFERENCE{Adelson-Velsky2005,
author = {Adelson-Velsky, G. and Gelbukh, A. and Levner, E.},
title = {On Project Scheduling with and/or Precedence Constraints},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {597-605},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {On Project Scheduling with and or Precendence Constraints.pdf:On Project
Scheduling with and or Precendence Constraints.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Shchepin, E. and N. Vakhania (2005). New tight np-hardness of preemptive multiprocessor and open shop scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 606-629
(pdf)
- Show BibTex
- @CONFERENCE{Shchepin2005,
author = {Shchepin, E. and Vakhania, N.},
title = {New Tight NP-Hardness of Preemptive Multiprocessor and Open Shop
Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {606-629},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {New Tight NP Hardness of Preemptive Multiprocessor and Open Shop Scheduling.pdf:New
Tight NP Hardness of Preemptive Multiprocessor and Open Shop Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Cai, X., X. Wu, and X. Zhou (2005). Single-machine scheduling with general costs under compound-type distributions. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 630-642
(pdf)
- Show BibTex
- @CONFERENCE{Cai2005,
author = {Cai, X. and Wu, X. and Zhou, X.},
title = {Single-Machine Scheduling with General Costs under Compound-Type
Distributions},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {630-642},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Single Machine Scheduling with General Costs under Compound Type Distributions.pdf:Single
Machine Scheduling with General Costs under Compound Type Distributions.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Khowala, K., A. Keha, and J. Fowler (2005). A comparison of dierent formulations for the non-preemptive single machine total weighted tardiness scheduling problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 643-651
(pdf)
- Show BibTex
- @CONFERENCE{Khowala2005,
author = {Khowala, K. and Keha, A. and Fowler, J.},
title = {A Comparison of Different Formulations for the Non-Preemptive Single
Machine Total Weighted Tardiness Scheduling Problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {643-651},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Comparison of Different Formulations for the Non Preemptive Single
Machine.pdf:A Comparison of Different Formulations for the Non Preemptive
Single Machine.pdf:PDF},
owner = {dap},
timestamp = {2008.09.29}
}
- Duin, C. and H. van der Sluis (2005b). On the complexity of adjacent resource scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 653-654
(pdf)
- Show BibTex
- @CONFERENCE{DuinvanderSluis2005,
author = {Duin, C.W. and van der Sluis, H.J.},
title = {On The Complexity of Adjacent Resource Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {653-654},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {On The Complexity of Adjacent Resource Scheduling.pdf:On The Complexity
of Adjacent Resource Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Bansal, N., D. Coppersmith, and M. Sviridenko (2005). Improved approximation algorithms for broadcast scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 655-656
(pdf)
- Show BibTex
- @CONFERENCE{BansalCoppersmith2005,
author = {Bansal, N. and Coppersmith, D. and Sviridenko, M.},
title = {Improved Approximation Algorithms for Broadcast Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {655-656},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Improved Approximation Algorithms for Boradcast Scheduling.pdf:Improved
Approximation Algorithms for Boradcast Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Ranson, D. and P.-H. Cheng (2005). Graphical tools for heuristic visualization. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 658-667
(pdf)
- Show BibTex
- @CONFERENCE{Ranson2005,
author = {Ranson, D. and Cheng, P.C-H.},
title = {Graphical Tools for Heuristic Visualization},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {658-667},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Graphical Tools for Heuristic Visualization.pdf:Graphical Tools for
Heuristic Visualization.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Adriaen, M., P. De Causmaecker, and G. Vanden Berghe (2005). Course timetabling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 669-670
(pdf)
- Show BibTex
- @CONFERENCE{Adriaen2005,
author = {Adriaen, M. and De Causmaecker, P. and Vanden Berghe, G.},
title = {Course Timetabling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {669-670},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Course Timetabling.pdf:Course Timetabling.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Drezet, L. and J. Billaut (2005). A predictive-reactive approach for rcpsp with labour constraints and time-dependent activities requirements. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 671-672
(pdf)
- Show BibTex
- @CONFERENCE{Drezet2005,
author = {Drezet, L. and Billaut, J.C.},
title = {A predictive-reactive approach for RCPSP with labour constraints
and time-dependent activities requirements},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {671-672},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Predictive Reactive Approach for RCPSP with Labour Constraints and
Time Depdendent.pdf:A Predictive Reactive Approach for RCPSP with
Labour Constraints and Time Depdendent.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Sarin, S., Y.Wang, and A. Varadarajan (2005). Solving a timetabling problem using benders decomposition. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 673-675
(pdf)
- Show BibTex
- @CONFERENCE{Sarin2005,
author = {Sarin, S.C. and Wang, Y. and Varadarajan, A.},
title = {Solving a Timetabling Problem using Benders Decomposition},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {673-675},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Solving a Timetabling Problem Using Benders Decomposition.pdf:Solving
a Timetabling Problem Using Benders Decomposition.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Rashidi, H. and E. Tsang (2005). Applying the extended network simplex algorithm to dynamic automated guided vehicle scheduling. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 677-692
(pdf)
- Show BibTex
- @CONFERENCE{Rashidi2005,
author = {Rashidi, H. and Tsang, E.P.K.},
title = {Applying the Extended Network Simplex Algorithm to Dynamic Automated
Guided Vehicle Scheduling},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {677-692},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Applying the Extended Network Simplex Algorithm to Dynamic Automated
Guided Vehicle Scheduling.pdf:Applying the Extended Network Simplex
Algorithm to Dynamic Automated Guided Vehicle Scheduling.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Blazewicz, J., M. Machowiak, T. Cheng, and C. Oguz (2005). On a certain berth scheduling problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 694-697
(pdf)
- Show BibTex
- @CONFERENCE{Blazewicz2005,
author = {Blazewicz, J. and Machowiak, M. and Cheng, T.C.E. and Oguz, C.},
title = {On a certain berth scheduling problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {694-697},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {On a Certain Berth Scheduling Problem.pdf:On a Certain Berth Scheduling
Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Burke, E., P. De Causmaecker, G. De Maere, J. Mulder, and M. Paelinck (2005). Forecasting
ight schedule robustness. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 698-700
(pdf)
- Show BibTex
- @CONFERENCE{Burke2005,
author = {Burke, E. and De Causmaecker, P. and De Maere, G. and Mulder, J.
and Paelinck, M.},
title = {Forecasting Flight Schedule Robustness},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {698-700},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Forecasting Flight Schedule Robustness.pdf:Forecasting Flight Schedule
Robustness.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Fan, C., M. Jumar, L. Lei, and J. Yang (2005). Scheduling the production and transportation operations subject to dynamic arrivals. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 701
(pdf)
- Show BibTex
- @CONFERENCE{Fan2005,
author = {Fan, C. and Jumar, M. and Lei, L. and Yang, J.},
title = {Scheduling the Production and Transportation Operations Subject to
Dynamic Arrivals},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {701},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Scheduling the Production and Transportation Operations Subject to
Dynamic Arrivals.pdf:Scheduling the Production and Transportation
Operations Subject to Dynamic Arrivals.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Kwan, A., I. Laplagne, and R. Kwan (2005). Building robustness into train driver schedules. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 702-703
(pdf)
- Show BibTex
- @CONFERENCE{Kwan2005,
author = {Kwan, A.S.K. and Laplagne, I. and Kwan, R.S.K.},
title = {Building Robustness into Train Driver Schedules},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {702-703},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Building Robustness into Train Driver Schedules.pdf:Building Robustness
into Train Driver Schedules.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Westphal, S. and S. Krumke (2005). Improved pruning in column generation of a vehicle routing problem. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 705-722.
(pdf)
- Show BibTex
- @CONFERENCE{Westphal2005,
author = {Westphal, S. and Krumke, S.O.},
title = {Improved Pruning in Column Generation of a Vehicle Routing Problem},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {705-722},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Improved Pruning in Column Generation of a Vehicle Routing Problem.pdf:Improved
Pruning in Column Generation of a Vehicle Routing Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Eglese, R. and W. Maden (2005). Vehicle routing and scheduling with time varying travel times. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 724
(pdf)
- Show BibTex
- @CONFERENCE{Eglese2005,
author = {Eglese, R. and Maden, W.},
title = {Vehicle Routing and Scheduling with Time Varying Travel Times},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {724},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Vehicle Routing and Scheduling with Time Varying Travel Times.pdf:Vehicle
Routing and Scheduling with Time Varying Travel Times.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Miori, V. (2005). A dynamic programming approach to the truckload routing problem using a triplet formulation. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 725-738
(pdf)
- Show BibTex
- @CONFERENCE{Miori2005,
author = {Miori, V.M.},
title = {A Dynamic Programming Approach to the Truckload Routing Problem Using
a Triplet Formulation},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {725-738},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Dynamic Programming Approach to the Truckload Routing Problem Using
a Triplet Formulation.pdf:A Dynamic Programming Approach to the Truckload
Routing Problem Using a Triplet Formulation.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Krasik, V., J. Leung, M. Pinedo, and J. Zhang (2005). Inventory control and scheduling with facilities in parallel. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 740-742
(pdf)
- Show BibTex
- @CONFERENCE{Krasik2005,
author = {Krasik, V. and Leung, J. and Pinedo, M. and Zhang, J},
title = {Inventory Control and Scheduling with Facilities in Parallel},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {740-742},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Inventory Control and Scheduling with Facilities in Parllel.pdf:Inventory
Control and Scheduling with Facilities in Parllel.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Sarin, S. and B. Nagarajan (2005). Analytic evaluation of the expectation and variance of different performance measures for scheduling jobs on a single machine under processing time variability. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005),
pp. 744
(pdf)
- Show BibTex
- @CONFERENCE{SarinNagarajan2005,
author = {Sarin, S.C. and Nagarajan, B.},
title = {Analytic Evaluation of the Expectation and Variance of Different
Performance Measures for Scheduling Jobs on a Single Machine under
Processing Time Variability},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {744},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {Analytic Evaluation of the Expectation and Variance of Different Performance
Measures for Scheduling Jobs.pdf:Analytic Evaluation of the Expectation
and Variance of Different Performance Measures for Scheduling Jobs.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}
- Bedoya-Valencia, L., E. Rodriquez-Velasquea, and G. Rabadi (2005). A genetic algorithm with random keys approach for the job shop scheduling problem with earliness and tardiness. In G. Kendall, L. Lei, and M. Pinedo (Eds.), Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Volume 2, New York, USA (18-21 July 2005), pp. 745
(pdf)
- Show BibTex
- @CONFERENCE{Bedoya-Valencia2005,
author = {Bedoya-Valencia, L. and Rodriquez-Velasquea, E. and Rabadi, G},
title = {A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling
Problem with Earliness and Tardiness},
booktitle = {Proceedings of the 2nd Multidisciplinary International Conference
on Scheduling: Theory and Applications (MISTA)},
year = {2005},
editor = {Kendall, G. and Lei, L. and Pinedo, M.},
volume = {2},
pages = {745},
address = {New York, USA (18-21 July 2005)},
month = {18-21 July 2005},
file = {A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling
Problem.pdf:A Genetic Algorithm with Random Keys Approach for the
Job Shop Scheduling Problem.pdf:PDF},
owner = {dap},
timestamp = {2008.10.01}
}